August & September 2020 The boiler smoke stack at W.E.B. (Water and Energy company Aruba) needed to be dismantled.
Tag Archives: aruba
AMAST renovates the pipeline bridge at Spanish Lagoon Balashi for WEB Aruba NV
Project period: June 2019 – March 2020 As a child I used to jump from this bridge, like many children still do. Now I was proud to be the one assigned to renovate the 60-year old pipeline bridge with AMAST. The pipelines on this important bridge are used to traffic fuel, water & electricity fromContinue reading “AMAST renovates the pipeline bridge at Spanish Lagoon Balashi for WEB Aruba NV”
Intake pump at WEB Aruba NV
Construction and installation of a new intake pump.
Amast supporting with crane service the construction of the new bridge at Spanish Lagoon Balashi
AMAST NV is verantwoordelijk voor de installatie van de nieuwe brug.
Work at dock
Amast helped with the installation of the new Gantry crane of the Aruba new Barcadera container harbor. The 100 metric ton (Demag Ac100-L) and 65 metric ton (Link-Belt HTC8670) cranes have been used for this project.
